Understanding G98

What is G98 Connect and Notify?

G98 is a simplified DNO notification process for smaller electrical installations that draw up to 16A per phase (approximately 3.68kW per phase). This includes most domestic solar, heat pumps and EV chargers.

When you need G98

  • Heat pumps up to 11kW
  • EV chargers up to 11kW
  • Single-phase solar installations up to 3.68kW

Benefits of G98

  • No approval needed - notification only
  • Fast 24-48 hour processing
  • Can install immediately after notification
Heat Pump Installations

DNO Notification for Heat Pumps

Fast DNO notification for air source and ground source heat pump installations

Commercial heat pump installation for G98 DNO application up to 16 amps per phase

Air Source Heat Pumps

Most domestic air source heat pumps fall under G98 requirements. We handle the DNO notification for installations up to 11kW, ensuring compliance with network regulations.

Single and three-phase systems
Domestic and light commercial
All major manufacturers supported

Ground Source Heat Pumps

Ground source systems often require G98 notification. We manage the submission process, working with your specific installation details and ground loop configuration.

Horizontal and vertical systems
Open and closed loop configurations
Hybrid heat pump systems

What we need for heat pump G98

Installation Details
  • • Site address and MPAN
  • • Heat pump make and model
  • • System capacity (kW)
  • • Phase configuration
Technical Information
  • • Electrical specifications
  • • Installation date
  • • MCS certificate (if applicable)
  • • Installer details
Documentation
  • • Manufacturer datasheet
  • • Site photo (meter location)
  • • Letter of Authority
  • • Proof of ownership
EV Charging Installations

DNO Notification for EV Chargers

Expert DNO notification for electric vehicle charging point installations

Domestic EV Chargers

Most home EV charging points up to 7.4kW fall under G98. We handle the notification process for wall-mounted and freestanding chargers at residential properties.

3.6kW and 7.4kW chargers
Smart and non-smart units
OZEV grant eligible installations

Commercial EV Chargers

Small commercial installations with charging points up to 11kW can use G98. Ideal for workplace charging schemes and small business installations.

Single and three-phase chargers
Multiple charging points
Workplace charging scheme approved
Electric vehicle charging port with cable connection for G98 DNO grid application

What we need for EV charger G98

Charger Details
  • • Site address and MPAN
  • • Charger make and model
  • • Charging capacity (kW)
  • • Number of charging points
Electrical Data
  • • Phase type (single/three)
  • • Maximum current draw
  • • Installation date
  • • Smart charger status
Required Documents
  • • Charger specification sheet
  • • Installation certificate
  • • Letter of Authority
  • • Site ownership proof
Simple process

How it works

Get your G98 notification submitted in three easy steps

Step 1

Submit installation details

Complete our quick online form with your heat pump or EV charger installation details. We'll verify everything is in order.

Step 2

We notify the DNO

We prepare and submit your G98 notification to the DNO within 24-48 hours, ensuring all information is accurate and complete.

Step 3

Installation confirmed

You receive confirmation of DNO notification. You can proceed with commissioning and your installation is compliant.

DNO application pricing

Simple, clear pricing

No hidden fees. Pay per application or enquire about bulk rates.

EV Chargers & Heat Pumps

G98 Applications

£50
+ VAT

G98 connect & notify service

Use this when the install is already completed and you need us to notify the DNO within the 28-day G98 window.

Application submission
DNO liaison & follow-ups
Real-time status updates

Solar Installations

G98 · G99

£50
+ VAT

Typical domestic install (10-12 panels)

Form completion
DNO submission
Status tracking & liaison

Add-ons available:

SLD Creation £50 + VAT
Commissioning Docs £50 + VAT

DNO

Management Solution

Multiple applications?

For installers submitting 10+ applications per month. Dedicated account management and priority support.

Find out more

Ready to notify your installation?

Get your G98 notification submitted within 24-48 hours

Start G98 notification

Takes less than 2 minutes

Have questions?

Not sure if you need G98? Want to discuss your project? We're here to help on WhatsApp.

Chat with us

Response within 15 minutes